Product descriptions from the supplier Heavy-duty 500kg rated load capacity for heavy workpiece handling. Large working radius up to 2826mm for wide-range operation. High repeat positioning accuracy of ±0.08mm for precise operation. IP65 protection level, dustproof and splash-proof for harsh ...
Product descriptions from the supplier 1. Supports 110 To 500 Kg Heavy Payload For Heavy Industrial Material Handling 2. Adopts 4 Or 5 Axis Motion Control To Meet Diverse Palletizing Working Demands 3. Delivers Stable High Speed Operation To Improve Factory Production Efficiency 4. Perfect For Bag ...
The KUKA KR6 R900-2 training workstation teaches material handling, programming and IO wiring on real industrial hardware with a 6 kg payload and 726 mm reach Delivery and commissioning dates are confirmed against the project schedule.
The KUKA KR 300 R2700-2 load unload robot carries 300 kg rated load across a 2701 mm reach, using multiple suction head options to feed food and beverage packaging lines Per cup vacuum monitoring protects product through each transfer.
The KUKA KR 180 R2900-2 handling robot moves 180 kg class castings and stampings across a 2900 mm working reach, keeping foundry and automotive cells fed without manual lifting on the line This keeps two stations supplied from one base position.
The KUKA KR 420 R3330 handling robot moves 420 kg castings and stampings across a 3326 mm working area, keeping automotive and foundry cells supplied without any manual lifting or waiting time on site.
The CNGBS six axis handling robot adds a second vacuum suction device, so one arm covers flat panels, cartons and film packs with 1850 mm vertical and 2100 mm horizontal tool travel on the head assembly.
This dress pack cable package supplies the complete cable and conduit set for automotive robot arms, sized from 50 to 70 mm with one or two internal routes Delivery and commissioning dates are confirmed against the project schedule.
This Yaskawa GP110 package mounts a 110 kg palletizing arm on a linear track, so one robot serves several pallet positions along a warehouse line Delivery and commissioning dates are confirmed against the project schedule.