Place of Origin:
Shanghai,China
Brand Name:
FANGYU
Contact Us
cleaning robot Remote control tracked photovoltaic cleaning equipment special cleaning robot for power station
Description | Model | Quantity | |
1 |
6 Axis Welding Robot
|
Model:KLTZ1520 AC220 V ,50/60HZ R=1507mm,Load=6kg Control cabinet: TRC3C-B06 Anti-collision welding torch: APG35Y Cable Line: Standard configuration |
1set |
MIG/MAG/CO2 Welding Power
|
Model: Panasonic YD-350GL5 Load rate: 60% ;MIG/MAG/CO2 Contain: Wire feeder , Control cable |
1set | |
Welding gun clearing station
|
Clean up the torch, fuel injection, cut the wire (3 in 1) Chinese brand |
1set | |
External axis servo motor |
Add 7 and 8 axis (Flipping positioner); Absolute encoder |
2 set | |
Robot extension cable | Robot extension cable (8m); And extension of external axis servo motor cable | 2 set | |
2 |
Servo head and tail positioner
|
Load≤250kg, Linked with the robot, Platform size 1400 * 800mm,, Precision RV reducer, External start button box, does not include fixtures |
2 set |
3 |
Conductive tip
|
Φ=1.0mm/Φ=1.2mm, 1 row = 10 pieces |
10 row |
4 | Welding torch cover |
350A air-cooled welding torch ; 1 row = 5 pieces |
10 row |
5 | Port fees | Container port costs | 1 set |
1. Workpiece data
Carbon steel products:
2. Welding robot workstation workflow
(1) First, fix the product to be welded on the platform of the A station, and then fix it with a special fixing fixture (the specific fixture is designed and manufactured by the customer). This ensures reproducible installation of the product, prevents the workpiece from falling off during the welding process and avoids welding distortion in certain areas.
(2) Obtain the required machining program in the robot welding control
(3) Press the start button of the A station positioner, and then the welding robot automatically performs the position welding required for the A station workpiece. At this point, the operator can install the product on the platform of the B station, the installation is completed, and then press the start button of the robot B station.
(4) After waiting for the welding of station A, the robot will automatically carry out the welding of the B station product (in the previous step, the operator retained the start button of the B station), at this time the operator manually removed the product of the A station. Repeat the installation again.
(5) Repeat the above steps
3. Workpiece precision requirement:
(1)The surface of the work shall not affect the quality of welding oil, rust, moisture;
(2)Must not affect the positioning of burrs, etc.;
(3)The clearance shall be no more than 1mm;
(4)The consistency error of the same weld group is less than 0.5m.
Component:
Send your inquiry directly to us